لديك سؤال؟ اضغط هنا
021-28423356
025-33550380
من السبت إلى الخميس: 8 إلى 16
الجمعة مغلقة
 
الوحدة الأولى ، بناء رقم 5 ، شارع فاربين ، شارع فرمانيه ، طهران ، إيران
منتزه قم للعلوم والتكنولوجيا ، شارع مولاوي ، بارديان ، قم ، إيران

سال انتشار 2016
محل انتشار Aubea 2016 ( 40th
نویسندگان S. Banihashemi1, G. Ding1, J. Wang2

مقاله:   Indetification of BIM-compatible Variables For Energy Optimization Of Buildinges - A DELPHI Study

Abstract

It is believed that drawing an applicable, relevant and coherent batch of variables is a fundamental tenet in the success of having an integrated BIM-based energy optimisation but in order to achieve a high level of usefulness, these variables need to be refined and prioritised. Thus, this paper is to investigate BIM compatible variables which are of top priorities for energy optimisation of residential buildings in the design stage. A sequential exploratory research was conducted to find out the most relevant and significant 

سال انتشار 2016
محل انتشار Journal of Engineering, Project, and Production Management
نویسندگان M. Reza Hosseini1, Ehsan Azari2, Linda Tivendale3, Saeed Banihashemi4, and Nicholas Chileshe5

مقاله:  Building Information Modeling (BIM) in Iran- An Exploratory Study


 

:Abstract

BIM has received considerable attention from academics and innovative construction companies in recent
years within the Iranian context. However, there is a conspicuous lack of studies, which give a picture of the current state
of BIM in Iran. To address this gap in the body of the knowledge, this study intends to present an account on the current
state of BIM with a focus on barriers and drivers associated with its adoption in Iran based on the perceptions of Iranian

سال انتشار 2016
محل انتشار Aubea 2016 ( 40th
نویسندگان M.R. Hosseini1, M.O. Namzadi2, R. Rameezdeen3, S. Banihashemi4, N. Chileshe5

مقاله:  Barriers To BIM Adoption : Perceptions From Australian Small And Mediumsized Enterprises

 

 

:Abstract

 

This study draws upon a questionnaire survey distributed amongst SMEs
in Australia to offer an insight into the main barriers to BIM adoption
within Australian SMEs. Based on analyses of 78 completed
questionnaires from non-adopters, the main barriers making SMEs shy
away from BIM adoption are discussed. The findings show that currently

طراحی و راه اندازی: انعکاس برتر




Search